Winona, MN
TCI provided design and construction services for this project. The new 20,000 SF addition included a steel structure, steel joist, deck roof structure and insulated metal panel exterior. The addition is served by a recessed loading dock with dock leveler and surface, drive-in overhead doors. New restrooms and locker space were built for employees.