Fort Riley, KS
TCI was the designer and construction subcontractor to The Clement Group on two medium 33,800 SF and one large 55,800 SF Tactical Equipment Maintenance Facilities. The TEMFs include: 10-ton crane, Future SIPRNeT Room and Communication Rooms. Each site also included an Organizational Storage Building (OSB) and three (3) - POL/HAZMAT Buildings, Trash Enclosure, three (3) - Above-Ground Storage Tanks, lighting, fencing, and landscaping. Each project was designed to be LEED Silver.